Flange Mounted R Type Geared Motor

Flange Mounted R Type Geared Motor

R series CZPTcal Geared Motor Characteristics

1. Attributes:

one. High performance: ninety two%-97%

 

2. Compact construction: Small offset output, two stage and three stage are in the identical box.

 

three. High precision: the gear is made of high-good quality alloy metal forging, carbonitriding and hardening remedy, grinding approach to make sure high precision and stable working.

four. High interchangeability: highly modular, serial layout, sturdy versatility and interchangeability.

2. CZPT parameters

Ratio 3.forty one-289.74
Enter electricity .twelve-160KW
Output torque sixty one-23200N.m
Output pace 5-415rpm
Mounting sort Foot mounted, flange mounted, foot and flange mounted, one-stage foot mounted, single stage flange mounted, Flange-mounted with extended bearing hub
Input Method Flange enter(AM), shaft input(Advert), inline AC motor enter, or AQA servo motor
Brake Launch HF-guide release(lock in the brake release place), HR-manual release(autom-atic braking place)
Thermistor TF(Thermistor defense PTC thermisto)
TH(Thermistor safety Bimetal swotch)
Mounting Situation M1, M2, M3, M4, M5, M6
Type R17-R167
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing substance HT200 higher-toughness forged iron from R37,forty seven,fifty seven,sixty seven,seventy seven,87
Housing materials HT250 Substantial toughness forged iron from R97 107,137,147,157,167,187
Warmth treatment technology carbonitriding and hardening treatment method
Effectiveness 92%-97%
Lubricant VG220
Security Course IP55, F class

CZPTshine Generate

ZheJiang CZPTshine Push Co.,Ltd,the predecessor was a condition-owned navy mould company, was proven in 1965. CZPTshine specializes in the full electricity transmission remedy for higher-end tools manufacturing industries dependent on the goal of “System Merchandise, Application Layout and Expert Service”.
CZPTshine have a sturdy complex force with more than 350 personnel at existing, like more than 30 engineering experts, 30 quality inspectors, masking an spot of 80000 square meters and kinds of superior processing equipment and tests equipments. We have a excellent foundation for the sector application improvement and support of large-stop speed reducers & variators proudly owning to the provincial engineering technology analysis centre,the lab of equipment pace reducers, and the foundation of present day R&D.

Our Group

Top quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

7. Certification.

Packing

Shipping and delivery

Flange Mounted R Type Geared Motor